Product Details:
Payment & Shipping Terms:
|
Model: | HG76 | Diameter Range: | 12-76mm |
---|---|---|---|
Thickness: | 1-3mm | Molding Speed: | 30-100m/min |
Material: | Carbon Steel,Stainless Steel | Motor Power: | 320kw |
High Light: | erw tube mill,stainless tube mills |
I. Brief introduction:
76mm welded pipe production line is designed to produce welded pipes of12mm-76mm in OD and 1mm-3mm in wall thickness, as well as corresponding square and rectangle tube.
II. Basic Technical Information:
1.Specification of pipes
Pipe OD: 12mm-76mm Thickness: 1mm-3mm
Square tube: 25mm×25mm 70mm×70mm, Thickness: 1mm-3.0mm
Length: 6 -12m Length Tolerance: ±3mm
2.Raw Material:
Material: Carbon steel coil(GB Q195-Q345); Alloy steel coil; API 5L X42-X80
3. Tube mill
Production Speed : 30-100m/min
Direction : left to right or right to left from operator`s side decided by customers.
III. The technical flow of the production line
Uncoiling→Shear & butt welding→Cage looping (Accumulating)→Forming →HFwelding→Removing & outsied Bead →Cooling→Sizing→Cutting off→Conveying →Downloading → Packing →Warehousing
IV. Makeup of tube mill line
1. Double-reel Mechanical Uncoiler
2. Shear & Butt Welder
3. Cage Loop(Accumulator)
4. Tube mill
5. Solid State H.F. welder
6. NC Flying Saw
7. Output Rollway
8. Rollers
Our Services
1.) We will send the engineer for the installation and training your workers how to operate this machine in correct way.
2.) Warranty Team
One year quality guarantee, life guarantee repair. Within quality guarantee period, except for failures caused by human error, repair parts will be provided for free. After the quality guarantee period, only charge the cost of the spare parts.
3.) We supply the pre-sell and after-sell service.
pre-sell service: workshop design, and production output design
after-sell service: installation and training, and the skilled engineer for working.
4.) We can also sent the engineer working for you serval months or 1 year. The engineer will help you to improve the output, reduce the waste and decrease the cost.
5.) We supply the pre-sell service-Design for whole project for stainless steel pipe making/ carbon steel pipe making.
6.) We will be responsible for the loading and shipping
Contact Person: Mr. Yan
Fax: 86-0311-8302-5332