Product Details:
Payment & Shipping Terms:
|
Pipe Diameter: | 25-76mm | Product Speed: | Max 50m/min |
---|---|---|---|
Material: | Carbon Steel,stainless Steel,low Alloy Steel | Cutting Saw: | Friction Saw Cutting |
Worm Gearing: | Max.80m/min | Pipe Thickness: | 4.0-10.0mm |
High Light: | erw tube mill,slitting line machine |
ERW Tube Mill Other Model
Model | Diameter Range | Pipe Thickness | Line Speed(m/min) |
HG20 | 8-25.4MM | 0.3-1.2MM | 120 |
HG32 | 10-32MM | 1.4-1.5MM | 120 |
HG50 | 16-76MM | 0.7-2.5MM | 30-120 |
HG76 | 25-76MM | 1-4MM | 30-100 |
HG89 | 32-89MM | 1-4.5MM | 30-80 |
HG114 | 45-114MM | 1.5-5.0MM | 30-60 |
HG165 | 60-165MM | 3-7MM | 30-50 |
HG219 | 114-219MM | 4-8MM | 20-40 |
HG273 | 114-273MM | 4-10MM | 15-30 |
HG325 | 165-325MM | 4-10MM | 10-30 |
HG426 | 165-426MM | 4-12.7MM | 8-25 |
HG508 | 219-508MM | 4-16MM | 8-20 |
Our Services
Quality Assurance
we Shall be responsilbe for quality problem resulted from design and manufacture with one year after successfull installation and debugging and all the expenses for replacing parts and components( exclude human factors and vulerable components ) shall be born by us !
Debugging
1) Factory will send 1-2technical engineers for installation and testing operation
2) The site, the equipment foundation, cool constructions etc. responsible by buyer according to equipment material which provides by supplier, the equipment for installation (lift equipment, tool etc.), the installation accessory material (wire, drive pipe, water pipe and so on), the labor force arranged by the buyer.
3) The buyer is responsible for power supply, water supply and gas supply to the equipment interface connector
4) Buyer Preparation Notes
(a)Machinery device takes the location (length* width)
(b)Power supply: Main power to equipment control bench, unit position
(c) Air feed: Air compressor (1.5 cubic meters/minutes
(d) Water supply: Water source to machine station
Contact Person: Mr.Yan
Tel: +8613001806008