Low Investment Steel Tube Making Machine For Infrastructure 80M/Min Roller Mills
Product Specifications
Attribute |
Value |
Materials |
Carbon Steel |
Cutting method |
Milling saw |
Equipment Specification |
Custom Engineered |
Forming method |
Roller Mills |
Speed |
80m/min |
Warranty |
One year |
Material |
Low carbon HRC |
Forming type |
Direct forming |
Product Overview
This steel tube making machine is ideal for infrastructure construction projects worldwide. The cold bending equipment produces finished products used in building materials, decoration, new energy, and other fields. With low investment requirements and high returns, this production line is perfect for companies new to the steel industry.
Manufacturing Process
- Unwinding
- Straight head
- Pinch leveling machine
- Shear welder
- Accumulator
- Roller forming
- Water cooling
- Roller sizing
- Cold saw
- Roller conveyor
- Bundle up
Equipment Components
Winding and Unwinding Reels:
Features a double expansion cantilever mandrel structure with pneumatic system for expanding, contracting, and braking operations.
Straightener & Leveler:
Flattens strip steel heads and tails to prepare for shear welding, ensuring straight and flat material for subsequent processes.
Automatic Shear and Welding:
Removes irregular tape parts and welds coil ends together with precision alignment.
Forming and Sizing:
Cold-bends steel strip into specified shapes with servo motor-adjustable sizing.
Cutting Machine:
Features hydraulic cutting with high-power servo, precision reducer, and imported rack/pinion transmission for ±1mm accuracy.
Production Process Walkthrough
Step 1 - Coils:
Carbon steel coils prepared for pipe and tube production
Step 2 - Uncoiler:
Carbon steel coil loaded onto uncoiler
Step 3 - Leveler:
Coil stock is leveled
Step 4 - Mill:
Flat steel formed into pipe through series of rolls
Step 5 - Mill Rollers:
Rolls shape material to specified dimensions
Step 6 - Welder:
Electric resistance welder completes pipe/tube formation
Step 7 - Scarfer:
Seam smoothing for uniform pipe/tube surface
Step 8 - Saw:
Final cutting to specified lengths
Factory Image